3.19.2010

Wall Building

All of the frames are built for the wall sections and I have two frames attached to drywall as of tonight. My goal is to put the rest of the drywall on tomorrow and have the shelves cut and installed by Sunday night.

Then lighting tests happen from 3/22 to 3/30.

Then I go to Big Tens until 4/4.

Then installation in the gallery from 4/5 till I leave for NCAAs (4/12).

Then I'm finished.

Still tinkering with lighting when I'm at home, finishing up Diorama #7 and details on the other 6, and starting to explore the presentation of the installation (frames/ vinyl lettering)

Picture updates tomorrow, I think.

No comments: