2.13.2010

Diorama #6 work


Cliff Doors, segments arranged in their final layout, the window will be near the top right of the front

Backside of the cliffs (paper mache is put on the back to counter the shrinkage/ curling of the foam caused by the paper mache on the front)


Detail shot of the Doors set into the walls

No comments: